Sapphire was given the challenge to solve a miriad of design issues that were required by the directors of Ashurst and the design team of Hassell. Sapphire developed a DDA compliant system featuring 50mm mullions and stiles with soft touch edges that feature bi parting doors mounted on overhead hung soft Open/close tracks combined with Barben Handles supplied and anodised in matching finish by Sapphire.
Sapphire also provided double glazed Frontline screen systems that divide the offices providing peace of mind with sound ratings that all together provide a quiet workspace for Ashurst employees.
It is one of the latest projects in New South Wales to achieve a 5 Star Green Star – Office Design rating
Sapphire was also engaged to provide the complex framing for the Mirror feature walls that feature curves of differing radiuses. Also Sapphire supplied all of the powdercoated trims for the glass lift lobbies.
Project Size – 4 Large levels